To comply with the warranties each manufacturer has a different set of specifications.
Tile subfloor requirements.
The difficulty is that tile can be installed over a number of substrates and each requires specific preparations to ensure a long lasting tile floor.
Most commonly the maximum moisture condition is 3 0 pounds per 1 000 sq.
To test your subfloor for moisture you should always take a moisture reading.
Today for tiles with all edges shorter than 15 in.
Per 24 hours when tested with the rubber manufacturers association test.
2 prepare a wood subfloor for tile.
Most floor tile is adhered to the subfloor or underlayment with cement based thinset mortar.
6 mm in 3m and no more than 1 16 in.
The subfloor must be able to hold the weight of the tile and preparation materials required to complete the installation.
The subfloor must be structurally sound as well as thick and stable enough to hold the weight of the tile without moving or flexing.
Underlayment is the material placed on top of the subfloor that assists in the installation of the tile or other type of flooring.
Regardless of the material it must be at least 1 inch thick.
Natalia baran istock gettyimages how to fix a bad subfloor.
0 38m the maximum allowable variation is no more than in.