Glue end joints of first row by applying a small but continuous bead tongue and groove adhesive or pvac glue to bottom side of the groove.
Tongue and groove flooring installation guide.
Align the first board with the layout line with the tongue facing into the room.
Always leave at least a 3 8 expansion space between flooring and all walls and vertical objects such as pipes and cabinets.
Step 3 apply glue and attach boards.
Rent a hardwood flooring nailer from a construction rental store to make installation easier.
Step 2 begin laying the boards.
Glue placement is very important.
If necessary you can apply a layer of vapor barrier to the floor and then you need to roll out.
Glue and glue placement the recommended glue for floating installation is tongue and groove engineered flooring glue.
Be sure that your first board is placed with the tongue edging pointing into the room.
Cut as needed to fit the row and to ensure each board ends in the middle of a stud or.
The glue must be placed along the topside of the groove the full length of the grooved side and end.
Seat the end tongue and groove flooring into each other and.
Pick the board s you wish to use for the row.
Pro tips for installing tongue and groove flooring prevent wood squeaks by using a sound absorbing underlayment between the subfloor and the hardwood flooring.
Put a 3 4 inch spacer against the.